Integrated greening method×長繊維緑化協会 - List of Manufacturers, Suppliers, Companies and Products

Integrated greening method Product List

1~1 item / All 1 items

Displayed results

Long Fiber Reinforced Soil Integrated Greening Method "Roving Wall Method"

Conservation of landscapes through soil structures mixed with long fibers and vegetation substrate spraying! It can be applied to various locations.

The "Roving Wall Method" is a general term for a construction method that consists of two types: soil structures in which long fibers are forcibly mixed into a mixture of sand and water, and greening techniques such as spraying vegetation substrate. Since it has reinforcement effects and allows for full greening, it is possible to preserve the landscape. Additionally, this method can be applied to various shapes of slopes and inclines, making it suitable for steep slopes, landslide areas, and the slopes of tunnel entrances. 【Features】 ■ Stable quality ■ Applicable in snowy and cold regions ■ Landscape preservation and reduction of environmental impact ■ Environment suitable for growth ■ Excellent portability and reduction of manual labor ■ Long-distance pumping up to 160m *For more details, please refer to the PDF materials or feel free to contact us.

  • Earth retaining wall/foundation reinforcement
  • Earthworks
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration